Digital News Guru New Delhi Desk:
Chief Minister Rekha Gupta inaugurated a state-of-the-art Electric Receiving Sub-Station (RSS) at Park Street near Central Vista — a key milestone in strengthening the power infrastructure for the Delhi Metro network.
This modern sub-station, developed by the Delhi Metro Rail Corporation (DMRC), is designed to ensure uninterrupted and reliable electricity supply to major metro corridors — particularly the Airport Line, the Violet Line (Line-6) and the upcoming Central Vista Metro corridor connecting Indraprastha to R K Ashram Marg.

Why This Matters: Reliable Metro Power for Commuters
Delhi’s growing metro system — one of the most heavily used public transport networks in the country — depends on robust electrical infrastructure to maintain seamless operations. The newly inaugurated RSS is part of that backbone and will:
- Support major metro lines with stable electricity supply, minimising service disruptions.
- Cater to future expansion needs, especially for the Central Vista expansion under Phase-5A of DMRC’s metro development.
- Use advanced electrical systems and automation to boost operational efficiency and help reduce maintenance delays.
The facility was rebuilt after the previous RSS — built in 2010 during Metro Phase-2 — was dismantled in 2021–22 to facilitate the Central Vista redevelopment. Reconstruction began in 2023 on alternative land provided by the Central Public Works Department and was completed in December 2025.
Features of the New Sub-Station
The Park Street RSS incorporates several modern enhancements:
- Advanced electrical systems, including high-capacity transformers and gas-insulated switchgear panels, designed to meet the current and future traction power demands of the metro network.
- Automation and safety upgrades such as automatic fire protection systems and fully addressable fire alarms to ensure continuous, secure operations.
- Energy-efficient climate control and lighting systems, aligned with green building norms to enhance sustainability and reduce operational costs.
- Plans for a rooftop solar installation for added green energy support and carbon footprint reduction.

CM Rekha Gupta’s Remarks & Government Focus
Addressing the media after the inauguration, Chief Minister Rekha Gupta reaffirmed the government’s commitment to strengthening the Delhi Metro as a reliable backbone of urban transport. She emphasised that expansion of the metro network remains a priority for her administration and that investments in core infrastructure like power systems are essential to ensure smooth and dependable service for millions of daily commuters.
Apart from the technical features, the event also underscored the city government’s broader aim to make public transport more efficient, resilient, and future-ready — key to reducing congestion, lowering pollution, and improving the overall commuting experience in Delhi.
Broader Impact on Delhi’s Transport Network
This new RSS installation is part of a larger infrastructure push that includes:
- Metro network extension projects — such as the recently approved Magenta Line expansions and future corridors.
- Sanitation and civic improvements to support the city’s overall quality of life.
For commuters, the upgraded power system means fewer interruptions, enhanced reliability, and greater confidence in one of the city’s key transport lifelines. Reliability improvements are especially vital as the metro continues to expand toward new residential and commercial hubs across the national capital.

What This Means Going Forward
With rapid urbanisation and escalating commuter demands, infrastructure resilience has become a core focus of city planning. The inauguration of this modern RSS represents a proactive step by Delhi’s government toward:
- Building a robust public transport ecosystem
- Supporting sustainable urban growth
- Reducing dependency on road-based transport
- Enhancing commuter safety and comfort
Moving ahead, similar upgrades across the metro’s electrical and signalling systems will be crucial as the network expands to over 500 km of tracks in the coming years, integrating new corridors that promise to bring more areas under metro connectivity.
You May Also Read: Aadhaar Authentication Mandatory for Property Registration in Uttar Pradesh from 1 Feb 2026







